TrueRE

Projects we are proud Of

Projects we are proud Of

GVMC Floating Solar Project – 3 MW

1. 3 MWp Floating Solar Project Installation at Visakhapatnam (GVMC Client )
2. Project was executed during toughest time of COVID-19 Pandemic, it is the first project of this size to be operational.
3. No safety hazards occurred during construction of the project.
4. Oriana is going big in this technology and eying 100MW+ installation in 2 years’ time

Udaipur Cement Works Limited – Mines Floating Solar Project – 1 MW

1. MWp floating solar power plant at UCWL-Mines area.
2. Project installed in the Fresh water lake of Mines.
3. Heavy Evacuation for the Installation of the cables due to the rules and regulations laid down by DGMS.
4. Solid bed of the lake posed challenges for the anchoring of the Solar Power Plant, challenge countered by using Solid Concrete block for anchoring.

JK Lakshmi Cement – Ground Mounted Project 8 MWp

1. 8MWp Solar Power plant installed at JK Lakshmi Cement, Sirohi.
2. Challenging site which required land filling of up to 2 meters for the installation of the plant.
3. Solar Structure installation along the hilly terrain with undulations ranging from 500-3000 mm.
4. Design and Execution skills helped in achieving 0% shadow during 8:30AM to 4:30PM all year around within the confined space available.

Udaipur Cement Works Limited Ground Mounted Project – 4.35 MWp

1. 4.35 MWp Ground Mounted Solar power plant at UCWL, Dabok.
2. Hill type terrain and rocky ground for the installation of the solar power plant posed challenges in the execution of the solar power plant.
3. Top part of the Hill has to be broken down and made somewhat flat hill to make the ground even for the installation of plant on either side of slope and remove the shadow issue.
4. Installed along the slope and terrain of the hill.